close Close
phone_iphone +46 (0)8 531 940 00

Semi Mobile System

Dustcontrol Semi Mobile System Construction 600x900

The DC 5900/5800c can be docked to a temporary or permanent tubing system installed in the work area. With a branch pipe package (item 3353), a temporary pipeline can be built in a stairwell or in a shakt. Several branch pipe packages can be connected in series or in branches.

The DC 5900/5800c can be docked to a temporary or permanent tubing system installed in the work area. With a branch pipe package (item 3353), a temporary pipeline can be built in a stairwell or in a shakt. Several branch pipe packages can be connected in series or in branches.

Show more Show less
descriptionDocuments north_east
mailContact north_east
Watch video
close

Contact

Name(Required)
Hidden
Dustcontrol, Box 3088, Kumla Gårdsväg 14, 145 03 Norsborg, SWEDEN